Vacancy title:
Flowlines & Deputy Package Manager - Req: 58898BR
Jobs at:
Total EnergiesDeadline of this Job:
24 June 2022
Summary
Date Posted: Monday, June 13, 2022 , Base Salary: Not Disclosed
JOB DETAILS:
Main Duties and Responsibilities
• To participate to technical meetings during the detailed design: to provide support and expertise and contribution to the progress of the detailed design and procurement engineering.
• To participate to construction meetings and guide the resolution of construction related issues linked to his/her area
• To participate to the Project HAZOP/SPOT and PTR and other audits and technical reviews, including coordination of Project answers and final resolution.
• To ensure proper reporting for his/her area and to highlight critical issues to the Offsites & Drilling Interfaces Package Manager.
• To contribute to improving the project lessons learnt and personnel skills.
• To contribute to the advancement of working methods and tools within his speciality.
• Organize and participate in internal and with Contractor technical meetings, challenge the EPSCC Contractor, moniter engineering to contribute to cost saving.
• Promote alternatives design to optimize works and schedule.
• Prepare weekly and monthly activity reports for his/her area in coordination with Offsites & Drilling Interfaces
• Package Manager.
• Identify and evaluate changes to basis for design, as early as possible, anticipate problems in his/her area
• Promote local content initiatives together with the National Content team and Offsites & Drilling Interfaces Package Manager Markaleca 20 roured with the facilities Cocinar and load DC to neurobot the engineeringWork closely, as required, with the Facilities Engineering Manager and lead DCC to ensure that the engineering deliverables, in particular the Class 1 from the EPSCC Contractor are reviewed and commented within the contractual timeframe.
• Work closely with the disciplines lead to ensure adequate follow-up of procurement and later coordination of equipment and material integration in the facilities Organize the monitoring of the inspection plans for the equipment and material supplied for his/her area and ensure follow-up until such equipment and material can be released and incorporated to the plant on site Work closely with the construction team to coordinate his/her area's activities during construction Organise regular visit on site for progress review and coordination purpose with Company construction teams and Contractor project teams on site Manage the planning of the well pad with the support of the planning team - develop the SIMOPS/COMOPS management process and implement it on a day to day basis during construction
• Review and prepare input to variation orders . Anticipate potential claim from the contractor and alert the Offsites & Drilling Interfaces Package Manager
• Propose approaches and elements of negotiation.
• Participate to the budget preparation and provide input to the project LOP for the part related to his/her area.
Qualifications & Experience
• Engineering degree.
• Minimum 9 years oil & gas experience with significant relevant multi-discipline engineering experience in EP industry is required to provide the necessary overview of the business, with experience in planning or project engineering. Strong technical, analytical, innovative and commercial skills.
• A good experience in planning, budgeting and managing interfaces.
• Thorough understanding of the risks and the technical/commercial issues associated with the development of oil and gas projects.
• Some experience of construction onshore or offshore with a good understanding of the construction constraints and implications for the project development.
• Conversant with International, group engineering standards, as well as HSE standards.
• Good communication skills and an aptitude for taking initiatives are essential, as is the ability to work in multi-disciplinary teams.
• Ability to manage the relationship with key stakeholders.
• Proven track record of result deliveries in challenging project environments.
Work Hours: 8
Experience in Months: 108
Level of Education: Bachelor Degree
Job application procedure
All applications should be sent through the TotalEnergies EP Uganda careers website at https://careers.totalenergies.com . ONLY APPLICATIONS RECEIVED ON THE STATED WEBSITE WILL BE CONSIDERED. Deadline is 24th June 2022
Short listing begins immediately, and only short-listed candidates will be contacted. "Candidates applying for the advertised positions will be selected on merit. Any form of canvassing is strictly prohibited." To know more about TotalEnergies EP Uganda, please
visit our website https://corporate.totalenergies.ug .
All Jobs
Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.