REQUEST FOR EXPRESSION OF INTEREST FOR PROVISION OF
Installation and Test Service For EACOP Pipeline HV/MV Cable and FOC REFERENCE NO.: CPP-PROC-UG-097-0218-TX
China Petroleum Pipeline Engineering Co., Ltd. (hereinafter abbreviated as CPP) as Pipeline, Feederline & Above Ground Installation Contractor for the East African Crude Oil Pipeline (EACOP) Project invites experienced and reputable Contractors to express their interest in provision of Installation and Test Service for EACOP Pipeline HVIMV Cable (high/medium voltage cable) and FOC (Fiber Optical Cable) to the EACOP Project.
The EACOP Project involves the construction and operation of an underground and cross-border pipeline to transport crude oil for export to international markets. The pipeline will run from Kabaale, Hoima District in Uganda to the Chongoleani peninsula near Tanga in Tanzania. The length of the pipeline is 1,443 km, of which 290 km will be in Uganda.
BRIEF DESCRIPTION OF THE SCOPE OF THE SERVICES:
Installation and Test Service for EACOP Pipeline HV/MV Cable and FOC, including HVIMV and FOC cable laying, cable accessories installation, cable joints (experienced and certified cable joint technicians are required), cable-grounding installation, cable trench excavation, backfilling and cable test (including continuity test, cuter sheath test, withstand voltage test, TDR test, LIRA test and optical cable OTDR test)
MINIMUM REQUIREMENTS:
Companies or organizations expressing their interest are invited to document their request with:
Uganda Registration Service Bureau (URSB) Annual retums of the latest year.
Fully filled Key personnel list with CV and Equipment list of production and inspection in requested format. (Blank is regarded as an unqualified item.)
Similar supplying experience within the last three years in the requested format.
Copy of certificates of ISO 9001, ISO 45001, ISO 14001, or equivalent of them. Tax Clearance Certificate for the latest year available.
Companies which have the ability, capacity, and resources to implement the activities listed above should express their interest by sending together with the documents stated in the above section through an email to supplierdata@cpptz.com (Max. Email Size: 20 MBs, all documents must be submitted in the English language) on or before 24:00 hours East African Time (EAT), on 20th March 2025. The subject of the email should be "EOI for CPP-PROC-UG-097-02118-TX-COMPANY NAME" CPP reserves the right not to consider companies that submit an incorrect email subject and the incorrect format of Appendix.
This same EOI is also available on EACOP's website (https://eacop.com/opportunitiesbymainconstructioncontractors/chinapetroleumpipelineengineering-co-ltd).
Note: CPP will review and assess the documents provided by companies that have expressed interest in accordance with this EOI and conduct evaluations based on internal criteria to determine which companies will be included in the list of pre-qualified companies. Only the pre-qualified companies will receive, by signing a Non-Disclosure Agreement (NDA), an invitation to bid as a continuation of the call for tender process. CPP reserves the right at its sole discretion to make the decision to select or reject a company and maintain its decision.
Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.